Friday, May 18, 2012 Login | 

Gretna - The Great Life

Gretna, Nebraska - The Great Life!

Gretna, NE

Gretna - A Growing Community

Gretna - A growing community in the middle of the heartland!

Gretna - Nebraska

Gretna - The Great Life!

Gretna - The Great Life!

Gretna - The Great Life!

Gretna - The Great Life!

 


Accessory Building
(View
 Printable Version Here)


The City of Gretna requires all construction to comply with the following building codes:


Ø    
2006 International Residential Building Code

Ø     2008 National Electrical Code

Ø     City of Gretna Zoning Code

 

Maximum size:

RE     (1 to 4 acres)                                TA (5 acres or more)

RE-A (1 to 4 acres - Animals)                  AG (10 acres or more)

 

Square footage of all sheds/accessory buildings/detached garages, taken together shall be subordinate to the principal building with regard to size and building footprint, except in AG and TA districts.

 

Required property line setbacks shall be maintained.  These are as follows:

                                                RE        RE-A                 TA        AG

Street Side Yard                        25ft.      25 ft.                 25 ft.     25 ft.    

Interior Side Yard                       10ft.      10 ft.                 25 ft.     25 ft.    

            Rear Yard                                  10 ft.     10 ft.                 10 ft.     10 ft.

            Maximum Height                        20 ft.     20 ft.                 35 ft.     35 ft.

            Maximum side wall height is determined by a 3:12 pitch roof        

 

All accessory buildings shall be to the rear of the principal structure.

 

No accessory buildings shall be built on a lot for more than six months prior to beginning construction of the principal building.

 

Detached accessory buildings or structures shall be located no closer than 6 feet to any other accessory or principal building.

 

Accessory buildings cannot be located within an easement or right-of-way (check with Sarpy County for the location of easements).  It is the homeowners responsibility to identify existing easements, location of lot lines and, if applicable, covenant restrictions. Before beginning construction, call Diggers Hotline 1-800-331-5666 for buried utility locations.

 

Inspections Required:

Ø     Footing Inspection - Once the footings are dug for the poles and before concrete is poured.

Ø     Rough-In/Framing/Electrical Inspection:  After all framing, electric and plumbing (if applicable) are “roughed-in” and before enclosing or covering.

Ø     Final Inspection - After the completion of the entire building.

 

Please allow a 24-hour notice when calling for an inspection.  The Building Inspections Office number is 332-3336, ext 209.

 

Note:  Building permit fee is based on square footage.


Please be advised this informational sheet is a summary guideline and is not conclusive of all codes and regulations.

       

City of Gretna

204 North McKenna Avenue - Post Office Box 69

Gretna, NE  68028
Main Phone:  402-332-3336
Fax:  402-332-5631

-Site Map-